Plumbing Epic Day 3

Is it Day 3 already? And it is supposed to be all done by Day 5! The tiles are further up the wall, with both patterns on the walls, the bath is in and full of water ( I think that is to bed it in and to make sure tiles don't shift when bath goes down later when it fills up ).
Oh and the toilet that was flooding on Day 2 was down to the higher water pressure that we have now. I see that as good news and yes my PMA is brimming over at the moment!
Dublin ( did you guess? ) was pretty boring but a very long day - to be sure.
Hopefully Day 4 will include great news about the rest of the bathroom suite, the flooring and the broken toilet, otherwise we will be very smelly and walking around with legs crossed.
Ju is down on Friday so not sure what state the place is going to be as she arrives!


0 Comments:
Post a Comment
<< Home